Home > Projects


Recent Projects

Residential Demolition
This project, one of our small-scale jobs, entailed demolishing this house in order for the church next door to expand   [details…]
Jewish Community Center
Plans for a new Jewish Community Center in Cincinnati required the demolition of two houses, along with partial demolition of an existing synagogue   [details…]
Lasita Building
The Lasita building in Cincinnati was an 18,000-square-foot produce storage facility that was brought down in order to increase parking capacity in the area   [details…]

Large-scale Projects

Gateway Center
A five-block area around Ohio State University in Columbus was earmarked for redevelopment  [details…]
University of Cincinnati  [details…]
Cincinnati Commercial Warehouse
At over 1 million square feet, the largest building ever demolished in Greater Cincinnati  [details…]
Site Work for the Paul Brown Stadium
Involved the demolition of 15 buildings, for a total of 1.5 million square feet  [details…]
Xavier University Football Stadium Demolition   [details…]
University of Cincinnati Nippert Stadium Demolition   [details…]

 

Partial and Interior Demolition

American Laundry & Machinery, Inc.
American Laundry had a 200,000-square-foot plant that needed redevelopment, but the connected office building was to be retained   [details…]
Middletown YMCA
This facility no longer used the building to the left but needed additional parking for the building to the right   [details…]
Cinergy Field
Removal of top layer of concrete  [details…]
Skywalk Network
Demolished skywalk while leaving attached buildings intact  [details…]
University of Dayton
Gutted burned interior  [details…]
Celotex Corporation
Gutted six-floor factory  [details…]

Special Challenges

Cincinnati Convention Center
Plans for an expansion of the Cincinnati Convention Center required removal of this side of the building   [details…]
Woodward High School
This wing of Woodward High School was to be replaced with a new wing   [details…]
Removal of Historic Facade   [details…]
Removal of Underground Gas Lines   [details…]
Raising 500-ton Bridge Two Feet   [details…]
Partial Demolition of Skywalk and Building   [details…]
Removing Water Tower from Tight Residential Area   [details…]
Demolition in Compliance with LEED Certification
A state recycling program requiring 50% of all materials to be recycled  [details…]

 

Hazardous Materials

Christ Hospital
Decontamination of hazardous waste incinerator  [details…]

 

Bridges and Railroads

Steel Bridge Removal   [details…]
Railroad Bridge and Signal Removal   [details…]

 

Smallest Project

Removal of ATM Machine  [details…]
   Copyright© 2005-2006 King Wrecking Company, Inc.  All rights reserved.

   King Wrecking Company, Inc.  •  5038 Beech Street  •  Cincinnati, OH 45212-2395
   Phone: (513) 241-1116  •  Fax: (513) 241-2506  •  E-mail: kingwrecking@fuse.net